The work
Excavation, concrete, structure, roofs, joinery, pools and finished homes. The whole journey, not just the last day.
11 items
Groundworks and excavation under way for a new swimming-pool structure.
Concrete-pumped foundations forming the base of the two bespoke new-build homes.
Tŷ Rhosyn & Tŷ Bedw
Reinforced concrete and structural steelwork forming the new swimming-pool base.
Reinforced concrete groundworks poured around a carefully fixed steel cage.
Concrete-pumped groundworks forming the structure of a new swimming pool.
Markham
A reinforced concrete slab and retaining walls prepared for a new garage.
Excavation and concrete foundation works at the start of the Tŷ Rhosyn build.
Site plant carrying out the excavation and muck shift for the new development.
A concrete base prepared for a swimming pool and rainwater-harvesting tank.
Bristol
Excavators and site plant shaping the ground for a complete external landscaping scheme.
Rhoose
Foundations, blockwork and pool groundworks progressing together across the new-build site.